A couple of weeks ago finally decided on what to do with the centre of the garden - have a sort of wild flower 'meadow' instead of just grass.
I put in plenty of grass seed and two boxes of wild meadow mixture as well, now we have some grass coming through in patches - obviously didn't quite get the depth of seed uniform - still it's a start
Saturday, 5 July 2014
Monday, 9 June 2014
Checking running of rolling stock ....
Had some nice weather yesterday, so popped out and ran a small train of representative rolling stock to check clearances and negotiation of curves etc. Everything went Ok much to my delight.
Some photos of the train in various parts of garden layout.....
Some photos of the train in various parts of garden layout.....
Sunday, 4 May 2014
Station !
A final push yesterday got the station area ballasted, track laid and the station with associated buildings in place. Nice to have the garden railway back in place.
View of station, showing siding ...
Gangers check the newly laid track ....
View showing the lineside hut and water tower...
Diesel (battery powered) approaches the station area...
I had the battery diesel running round for a while - picked up some areas of uneven track, which required a jiggle of the ballast to correct. Plenty left to to do......
Gangers check the newly laid track ....
View showing the lineside hut and water tower...
Diesel (battery powered) approaches the station area...
I had the battery diesel running round for a while - picked up some areas of uneven track, which required a jiggle of the ballast to correct. Plenty left to to do......
Wednesday, 30 April 2014
Buildings for the station area....
The main station, this will sit on some offcuts of decking, needs a clean and a few repairs but ready for use.
I'll use a small building as a line-side hut, need to stick on one of the side panels which has come loose and give the roof a re-paint.
I'll use a small building as a line-side hut, need to stick on one of the side panels which has come loose and give the roof a re-paint.
Friday, 18 April 2014
a few checks .....
Took advantage of the sunny weather yesterday to do a few bits and bobs
firstly engineers check the clearances in the station approach from the signal box ...
engineers find the track somewhat off-centre of in rockery cutting...
a quick visit by the track gang (me) gets the track sitting centrally
After a rummage in the garage I got the the necessary bits of track out for the station area and laid them out to check alignment etc ...
not too bad - only about 3" out of alignment at the top end
firstly engineers check the clearances in the station approach from the signal box ...
engineers find the track somewhat off-centre of in rockery cutting...
a quick visit by the track gang (me) gets the track sitting centrally
---oXo---
After a rummage in the garage I got the the necessary bits of track out for the station area and laid them out to check alignment etc ...
not too bad - only about 3" out of alignment at the top end
Sunday, 13 April 2014
Station approaches completed .....
Added the edging and laid the track for the station approach from the signal box
put down the track down for the station approach from the top (in the trackbed section which I prepared previously)
Now in full swing I got started on the station section - had a massive 'dig-o-mania' puting in the edging to the middle of the garden and dug half of the trackbed
a few more sessions should see the station section in place - more gravel to buy, the station layout to plan .....
put down the track down for the station approach from the top (in the trackbed section which I prepared previously)
Now in full swing I got started on the station section - had a massive 'dig-o-mania' puting in the edging to the middle of the garden and dug half of the trackbed
a few more sessions should see the station section in place - more gravel to buy, the station layout to plan .....
Sunday, 6 April 2014
Next section of trackbed prepared ....
A rather damp day yesterday but but I managed to get further by getting the next section of the trackbed completed.
On my next session will put the weed fabric down and get some more track in place; after this section is done I will be ready to get to work on the station section.
On my next session will put the weed fabric down and get some more track in place; after this section is done I will be ready to get to work on the station section.
Subscribe to:
Comments (Atom)


















