Wednesday, 18 September 2024

Buildings...

Garage Layout

I've had a low relief plastic toy building on the garage layout for some time, today decided to get it finished off.  In its original state, looking very 'plastic'

added some doors for the second floor made with some spare plasticard plus something that looks like a hoist..
A quick simple paint scheme and back on the layout .....

Garden Layout

As the buildings stay out all year round, they need a clean and on some the roofs get a lick of paint 

its washy-washy time .....
red oxide primer to redo the roofs...
and then they go back in their usual spots ...............


Saturday, 14 September 2024

Train time ....

Enjoyed the late summer sunshine today and ran a couple of trains.. passenger and a tanker train