Sunday, 29 October 2023

K1 Garratt Project (10) - Couplings, weights and run test ....

Couplings added ....

Finished the coal bunker as well...
For weights for running adhesion I cut down those from the donor locos so they fitted in the end tanks...


Out to the garage layout for a run test ....
Run test with coaches ...  (YouTube link, may take some time load)

the run test picked up some problems - one being my controller kept cutting out - it has only enough output to drive one loco chassis not two. I could have one loco with no motor - will have to try that out.

Tuesday, 24 October 2023

K1 Garratt Project (9) - The water tanks/coal bunker

 Turning my attention to the water tanks and coal bunker...

The tanks made and the tops trial fitted (will fix them in place once suitable traction weights are added)....


top view of the rear tank, front part will be the coal bunker ... 

tanks are currently held in place with a screw into the chassis (may need to add extra fixings later)


Friday, 20 October 2023

K1 Garratt Project (8) - Footplate, boiler & cab ......

Making good progress on the build ...

Underside of plastikard footplate showing weight for adhesion ( I may need to add more later...)

The two 0-4-0 motions get a bit of padding on top to provide some support ...
bolier and cab fixed in place (whole thing is no quite rigid...)
Handrails to get from steps to cab ...
and of course the steps...
the main structural centre part of the loco build is now completed ...
 

Tuesday, 17 October 2023

K1 Garratt Project (7) - Safety Valve...

The shiny dome rather showed up my improvised safety valve made of plastic bits

so a suitable one fitted - a Ramsbottom Safety Valve,  plus a whistle...
The boiler and back-head assembly mostly done...
My order of Plastikard arrived from Slaters this morning so I've cut and marked up the footplate

Wednesday, 11 October 2023

K1 Garratt Project (6) - Rear Tank and Cab...

While waiting for delivery of some plastikard I've ordered for the build, I made a neat'ish drawing of the pieces for the front tank...

I wanted to use the same tank construction for the rear tank as well, so I sketched out a scheme for the rear tank (and coal store) to fit inside the back of the cab as per the real engine,
I spent a good half hour 'carefully' removing the bottom part of the back of the cab...
using my mock-up cardboard tank I fixed a profile of the coal bunker to it (slightly narrower than the tank); fits just right into the rear of the cab...
going round a curve the loco will pivot; a check on the worst-case cornering position the coal bunker doesn't touch the cab side - super 😀
The coal bunker will work as an add-on to the rear tank, although I need to take a bit out of the tank edge facing the cab for the coal to sit in.  The final coal bunker will be best designed once I get to the build stage.

Sunday, 8 October 2023

Autumn train time ...

Sunday afternoon... a lovely warm day early October ... time for running a small train ...




 

Monday, 2 October 2023

K1 Garratt Project (5) - dome and handrails...

Some bits arrived in the post this morning - a brass dome and some handrail supports.

The tricky bit drilling holes in a straight line along the boiler....

the hand rails fixed in and the dome in place
coming along nicely..


Sunday, 1 October 2023

K1 Garratt Project (4) - Water tank prototype...

 Knocked up a cardboard prototype of the end water tanks...

clearance check round R1 curves - front 
clearance check round R1 curves - back
the back tank will have a more than prototypical gap between it and the cab. Part of the tank also served as a coal bunker and fitted into the back part of the cab - I will probably have a coal bunker on the top part of the rear of cab which will overhang the tank.