Sunday, 29 October 2023

K1 Garratt Project (10) - Couplings, weights and run test ....

Couplings added ....

Finished the coal bunker as well...
For weights for running adhesion I cut down those from the donor locos so they fitted in the end tanks...


Out to the garage layout for a run test ....
Run test with coaches ...  (YouTube link, may take some time load)

the run test picked up some problems - one being my controller kept cutting out - it has only enough output to drive one loco chassis not two. I could have one loco with no motor - will have to try that out.

1 comment:

The Good Soldier Svjek said...

Great to see it up and running !