With all the rain we've been having recently the little weeds have been getting rather large - so today I've beeing pulling them all up and putting down weed killer where needed. In the farm area of the layout I left some of the ground cover weeds in place - they look ok with the cows and horses ....
Beamish Town, the weeds had grown in between the floor tiles I use for roads, now they are removed it looks so much better ...
Saturday 25 July 2009
Sunday 19 July 2009
Control Box finished
Friday 17 July 2009
Control Box and Wiring up ...
I eventually found a suitable sized control box - a weather proof metal letter box. Nice opening door, the controller I use sits inside quite nicely. Piccies below show it in place and the conduit for the switch and power wire layed out ready, lots of annoying work to take up of paving slabs to keeps the conduit out of sight.
In the station area the conduit will sit under the ballast. The track has to be taken up to attach the switch and power wires, so a bit of work to do - I wish I'd done it when I layed the track orginally.
In the station area the conduit will sit under the ballast. The track has to be taken up to attach the switch and power wires, so a bit of work to do - I wish I'd done it when I layed the track orginally.
Subscribe to:
Posts (Atom)