Saturday 19 May 2018

'In Print' and first running session this year ...

The CVR is in June 2018's Garden Rail magazine...

 So today after finishing my garden jobs (cutting the grass and some planting) I had a celebratory running session (the first of the year). Short train - battery Diesel loco, wagon and coach
 practiced stopping at the new halt ....
passengers in the coach had come to see the dinosaurs which roam on the upper central island...
I spent a pleasant 15 or 20mins running the train round the layout  ðŸ˜€

Sunday 13 May 2018

Rockery Bottom Halt ....

As part of refurbishing the rockery,  after removing some plants I sized up where to put a simple small halt for the railway...
The best place was just after curve before going into rockery cutting, a rummage in the garage yielded a spare split log roll and some brick pavers. So a bit of digging out and a slim trench made with a spade to put in the split logs...
 split log roll tapped (bashed) into in place with mr sledge and a brick paver tried for size ...
 used up the rest of the brick pavers to form the platform surface
I used an old 'Sylvanian Families' toy building as the shelter (needs work on the roof/front); engineers inspect the new halt ....