After a quick fag-packet design, an hour or so cutting plasticard and sticking it together (sometimes a little adjustment needed), I finished of two guards compartments to go in the brake-third coaches; they have simple sliding doors aligned with seat positioning.
Sunday, 23 February 2025
Coach works(6) : Guards Compartments ...
Sunday, 16 February 2025
Coach works(5) : Guards Doors and Seating ...
Marked and scribed the edge of the guard's door on the sides of two brake 3rd carriages.
Cut the seating pieces up and refitted them so there is a gap for the guards compartment in the brake 3rdsSeating pieces slightly altered to give a better arrangement for the 'all third' carriage.
Sunday, 9 February 2025
Coach works(4) : Roof - Rain Strips ...
The order for the styrene strip for the roof rain strips arrived this week....
First one cut to length and fixed in place ....tricky job, once I'd got the scheme I added the second one for this roof and did the other two roofs.
Monday, 3 February 2025
Coach works(3) : Those Darn Couplings ...
A picture note to myself to remind me what to cut off the end of each of the coaches for coupling clearance.
- Extra support for the steps (still robust enough without)
- The cross bar
Down the garage for a run test....
very tight but just enough room for the couplings to traverse across to negotiate the Radius 1 curves on my layout...
Thats sorted out the couplings.
Wednesday, 29 January 2025
Coach works(2) : Coupling Test and Storage
Getting started on aspects of the project ....
My large Bagnall 2-8-2 loco will be hauling the full train of bogey coaches so I replaced the coupling on it's tender with an Accucraft one
Coupling Test
simple cut and remove solves that one ....
testing on the layout curves, the coupling fittings catch just enough on the corner of the underframe - another 1 mm of travel would help.
I will get some replacement nuts and bolts; the top of the bolt will sit nearly flush with the top of the coupling and fix the problem round the curves - thats the theory 😀
Sunday, 26 January 2025
Coach works(1) : Disassembly and Couplings
Disassembly
The coaches I've selected for my project are held together with screws, so a quarter of an hour with a screwdriver ..
Thursday, 23 January 2025
Coachworks - The Project
The madness of the 'yearly project' is upon me; this time to make some freelance bogey coaches.
Rather than buy some expensive kits (a bogey coach is £120+) I decided to do some conversions of commercially available rolling stock. On Ebay I picked up 4 of the Newqida coaches at £30 each, like this one
In theory they go round the LGB radius 1 curves on my layout, but not quite so some tinkering required.
In terms of conversions I'm leaning towards making them into something like the W&L Pickering coaches which were made by Accucraft....
Something to aim for 😀 At least with four cheap coaches to hack about and modify if one goes wrong I won't be too bothered.



















