Saturday, 22 April 2017

Getting ready to run ....

Finally got round to getting ready to run trains again.

The trackbed has been weeded and sprayed with weedkiller as a preventative measure. So now ready to run battery powered trains, hope to get to work cleaning the track for electric powered trains.

A bit of track maintenance is required; derailments over the past in rockery cutting have resulted in an inspection by the company engineers..
a new section of track has been recommended - a rummage through the spare track in the garage is needed, plus a bit of use of a hacksaw to get the right lengths.

3 comments:

  1. Looking forward to seeing the trains running.
    Alan

    ReplyDelete
  2. Get those leaves of the track ! , Tony

    ReplyDelete
    Replies
    1. I'll be getting the brush out today :)

      Delete