Finally got round to getting ready to run trains again.
The trackbed has been weeded and sprayed with weedkiller as a preventative measure. So now ready to run battery powered trains, hope to get to work cleaning the track for electric powered trains.
A bit of track maintenance is required; derailments over the past in rockery cutting have resulted in an inspection by the company engineers..
a new section of track has been recommended - a rummage through the spare track in the garage is needed, plus a bit of use of a hacksaw to get the right lengths.
4 comments:
Looking forward to seeing the trains running.
Alan
Get those leaves of the track ! , Tony
I'll be getting the brush out today :)
What make is the Landy please?
Post a Comment