The fiddling, fettling and faffing continues....
Strengtheners added to the interior of the front....
the top of the front was not level, so a little bit of plasticard added.....
strengtheners for the cab sides....( I knew those mini g-clamps I bought 5 years ago would come in useful)
beading round the cab door area ...The back of the cab strengthened..
Improving the cab door definition and adding a door knob..
making the frame for the roof... (which lifts out, so I can put the roof on and take it off)
mostly complete, but quite a few things left to do..
- trim on underside of roof
- internal cab detail (backplate, coal bunker etc)
- front and back cab window frames
- fill in the holes and sand off
- a simple way to secure the chassis to the loco body
- some loco crew
- aftre that its off to the paint shop ....











No comments:
Post a Comment